SAVED GREEN SAVED BANGLADESH
Saturday, November 28, 2015
Thursday, November 19, 2015
Green bricks & block technology.
FLY-ASH BRICK MANU FACTURING PLANT
Technology/Process Description:
The Flyash brick making plant has been designed to manufacture flyash with FAL-G Technology. The heart of the plant BRICK MAN is an indigenously designed, a relatively low cost and high productivity machine. The plant consists of the following equipment:
BRICK MAN
1. It is a hydraulically operated, automatic and controlled by electronic circuits. The electronic circuit is self diagnosing. It has an optional alpha-numeric display, computer connection and modem that can be connected to the computer through telephone lines to detect local faults in advance.
2. Brick making machine develops 30 T of compressive force over the bricks uniformly to hold pressure for the required time allowing the material to flow and form
3. The compressive force can be varied by turn of a knob
4. The machine structure is designed to take up heavy cyclic loads
5. The compressive ratio (1:1.6- brick height: filling height) can be varied infinitely within the limits of the moulds
6. Different size of moulds can be fitted with maximum size of 230x 200x 100mm
7. Monogram on the brick can be embossed
8. Efficient water cooling system to ensure the continuous running of the machine
PAN MIXER
1. A sturdily constructed machine with heavy rollers to grind and mix material thoroughly
2. Drive through quality worm reducing gear box
3. Changeable bottom gear plates with scrappers fitted with TC tips
4. Easy bottom loading mechanism with rap pinion door arrangement
CONVEYOR
1. Frames and intermittent bins are fabricated sturdily
2. The flyash mix can be regulated according to the speed of the brick making machine
3. Nylon with rubber top conveyor belts
4. Friction-less idlers
PALLET TRUCKS
Novel and ergometric design to handle the bricks with pallets for effortless and easy transportation of flyash bricks.
FAL-G MIX: FLYASH LIME AND GYPSUM MIX
The FAL-G mix is a slow setting pozzalona cement mix. Clay and limestone are burnt with coal, gypsum is mixed and ground to make cement. Fly Ash with burnt clay particles (Oxidizes of Clay) obtained from burning of coal are mixed
Technology/Product Specifications:
The company manufactures and designs cost effective high-tech construction equipment in Bangladesh. It has supplied flyash brick making plants with the state of the art which is an affordable high-tech process and equipment to manufacture high quality bricks with flyash and other industrial waste.
HIGH DENSITY CONCRETE BLOCK MANUFACTURING FACILITY
Technology/Process Description:
In High Density Concrete Block Making Machine, wooden or steel pallets are fed and located by the chain conveyor, on high frequency vibrating table. Mould is filled manually which is over the pallet. The mix is pressed and vibrated on both sides simultaneously, resulting in voids free, high density blocks with excellent texture and finish.
The blocks thus formed are voids free, 30% more denser which makes the block less water obsorbtion and manifold increase in strength which is not at all achievable in egg laying and hand operated machines.
Formed blocks are dragged away from the machine by the chain conveyor and handled manually.
Technology/Product Specifications:
The company manufactures and designs cost effective high-tech construction equipment in India. It has developed a range of concrete block making machines which are well accepted in the market and exported to other countries.
Technical Specifications
1. Production Capacity (50 - 60 Strokes/hour): This is indicative only. Actual production rate depends upon the operator efficiency, mix feeding and mix design. Weigh batching, pallet & block handling, steam curing systems can be supplied to the required level of automation of the customers.
No. of blocks per stroke
200 x 200 x 400 mm
|
� 2/3 Nos.
|
150 x 200 x 400 mm
|
� 3/4 Nos.
|
100 x 200 x 400
|
� 4/6 Nos.
|
230 x 110 x 75
|
� 10 Nos.
|
Pavement Blocks
|
� 2 Sq.feet
|
Total power required
|
� 27 H.P
|
2. Hydrulic Pump Motor: ������������������� 5 HP 1440 RPM
3. Mould Table Vibrator 5 HPx2:������ 10 HP 6000 RPM
4. Ram Vibrator 5HP x2:�������������������� 10 HP 6000 RPM
5. Conveyor Chain Drive:������������������ 2 Hp 1440 RPM
6. Mould table Size: ��������������������������� 600x800mm
7. Hydraulic Load Developed & Applied on concrete blocks by Ram: 4000 Kg
8. Mix Feeding:������������������������������������ Manual from two sides
9. Steel Pallet Feeding & Removal with Blocks: Manual / Mechanical
Company Profile
Company Name
|
Engineers Enterprises
|
Address
|
189, Bharathiyar Road (Ganapathy- Maniyakanpalayam Road, Ganapathy, Coimbatore- 641006, Tamil Nadu
|
Contact person
|
Mr. M, Gunasekar, Managing Partner
|
Phone
| |
Fax
| |
E-mail
| |
Web Site
| |
Year of Establishment
|
1988
|
Product(s) Manufactured
|
Fly Ash Brick Making Plant, Concrete Block Machines, Soil Block Plant, Rotatory Waste Press, Cement Tiles Moulds, Pavement Block Cutting Machine etc.
|
Installed Capacity per annum
|
� Fly Ash Brick Making Plant � 120 Units
� Concrete Block Machines � 300 Units
|
Sales Turnover
|
FY 05: USD 0.77 Mn
FY 04: USD 0.54 Mn
FY 03: USD 0.37 Mn
|
Conformity to Standards
|
Indian Standards
|
Foreign Collaboration
|
NIL
|
Manpower Total (Nos.)
|
50
|
Effluent Generated
|
NIL
|
Broad Profile of Project Offer
Project Features
|
Project 1 A
(Setting up Facility for Fabricating Plants for Making Fly Ash Bricks)
|
Project 1B
(Setting up Facility for Fabricating Plants for Making Fly Ash Bricks)
|
Project 2��
�(Setting up Facility for for Manufacturing HDM 1000
|
Capacity
|
2000 Bricks/ Hour of size 230x 110x 75mm
|
4000 Bricks/ Hour of size 230x 110x 75mm
|
1000 blocks/8 hr shift
|
Land
|
70�x 70�
|
100�x100�
|
10,000 Sq ft of land with borewell or open well
|
Power
|
80 HP
|
106 HP
|
27 HP
|
Plant & Machinery and Test Equipment
|
- BRICK MAN machine with 60T Press and 4 bricks per stroke with 30 HP Motor
- Auto Mix Feeder with 2 HP Motor
- Pan Mixer with 750 Kg capacity with 30 HP Motor
- Belt Conveyor� with 3 HP Motor
- Pallet Trucks
Optional Facilities
- Raw Material Batch weigh bin
- Off- Bearer to remove bricks manually
- Silo for Flyash of capacity 40T
- Front end loader of capacity 750 Kg
- Wooden Pallets
|
- BRICK MAN machine with 160T Press and 8 bricks per stroke with 30 HP Motor
- Auto Mix Feeder with 2 HP Motor
- Pan Mixer with 1000 Kg capacity with 40 HP Motor
- Belt Conveyor with 3 HP Motor
- Pallet Trucks
Optional Facilities
- Raw Material Batch weigh bin
- Off- Bearer to remove bricks manually
- Silo for Flyash of capacity 40T
- Front end loader of capacity 750 Kg
- Wooden Pallets
|
- Hydraulic Pump Motor
- �Chain Conveyor Motor
- Mould Table Vibrator
- �Ram Vibrator
- �Steel Pallets
- �Main Mixer
- �Face Mixer
- �Pallet Trucks
- Skip Loader
- �Electronic Weighing Scale
- �Ram & Mould (Cavity Blocks)
- Solid Blocks and Pavement Blocks)
|
Implementation Period
|
3-4 Weeks
|
4-5 Months
|
2-3 Weeks
|
Manpower Required
|
12 people/shift
|
14 people/shift
|
13 people/shift
|
Raw Materials
|
Flyash, Lime, Gypsum, Sand
|
Flyash, Lime, Gypsum, Sand
|
Cement, Sand and down metal
|
Total Project Cost
|
USD 50000 (excluding land & building)
|
USD 0.1 Mn (excluding land & building)
|
USD 50000 (excluding land & building and taxes and duties)
|
Profitability
|
20%
|
20%
|
20-25%
|
Tuesday, November 17, 2015
Bangladesh government holly day list.
দেখুন আগামী বছরের ছুটির তালিকা
===============================
গত ২ নভেম্বর ২০১৬ সালের সরকারি ছুটির তালিকা অনুমোদন দিয়েছে মন্ত্রিসভা। আগামী বছর সাধারণ ও নির্বাহী মিলিয়ে মোট ছুটি থাকবে ২২ দিন। এর মধ্যে ১৪ দিন সাধারণ ছুটি ও নির্বাহী আদেশে ছুটি আটদিন। সচিবালয়ে মন্ত্রিসভার বৈঠকে এ অনুমোদন দেওয়া হয়।
সাধারণ ছুটি
২১ ফেব্রুয়ারি (৯ ফাল্গুন), রোববার আন্তর্জাতিক মাতৃভাষা ও শহীদ দিবস।
১৭ মার্চ (৩ চৈত্র), বৃহস্পতিবার জাতির জনক বঙ্গবন্ধু শেখ মুজিবুর রহমানের জন্মদিন।
২৬ মার্চ (১২ চৈত্র), শনিবার স্বাধীনতা ও জাতীয় দিবস। ১ মে (১৮ বৈশাখ), রোববার মে দিবস।
২১ মে (৭ জ্যৈষ্ঠ), শনিবার বুদ্ধপূর্ণিমা (বৈশাখী পূর্ণিমা)। ১ জুলাই (১৭ আষাঢ়), শুক্রবার জুমাতুল বিদা।
*৬ জুলাই (২২ আষাঢ়), বুধবার ঈদুল ফিতর।
১৫ আগস্ট (৩১ শ্রাবণ), সোমবার জাতীয় শোক দিবস।
*২৫ আগস্ট (১০ ভাদ্র), বৃহস্পতিবার জন্মাষ্টমী।
* ১২ সেপ্টেম্বর (২৮ ভাদ্র), সোমবার ঈদুল আজহা।
*১১ অক্টোবর (২৬ আশ্বিন), মঙ্গলবার দুর্গাপূজা (বিজয়া দশমী)।
*১২ ডিসেম্বর (২৮ অগ্রহায়ণ), সোমবার ঈদে মিলাদুন্নবী (সা.)।
১৬ ডিসেম্বর (১১ পৌষ), শুক্রবার বিজয় দিবস।
২৫ ডিসেম্বর (১১ পৌষ), রোববার যিশুখ্রিস্টের জন্মদিন (বড়দিন)।
নির্বাহী আদেশে সরকারি ছুটি
১৪ এপ্রিল (১ বৈশাখ) বাংলা নববর্ষ।
২৩ মে (৯ জ্যৈষ্ঠ) শবে বরাত।
৩ জুলাই (১৯ আষাঢ়) শবে কদর।
৫-৭ জুলাই (২১-২৩ আষাঢ়) ঈদুল ফিতর (ঈদের পূর্বের ও পরের দিন)।
১১-১৩ সেপ্টেম্বর (২৭-২৯ ভাদ্র) ঈদুল আজহার পূর্বের ও পদের দিন।
১২ অক্টোবর (২৭ আশ্বিন) পবিত্র আশুরা।
ঐচ্ছিক ছুটি (মুসলিম পর্ব)
২২ জানুয়ারি (৯ পৌষ) ফাতেহা-ই-ইয়াজদাম।
৫ মে (২২ বৈশাখ) শবে মেরাজ।
২৩ মে (৯ জ্যৈষ্ঠ) শবে বরাত।
১ জুলাই (১৭ আষাঢ়) জুমাতুল বিদা।
৩ জুলাই (১৯ আষাঢ়) শবে ক্বদর।
৬ জুলাই (২২ আষাঢ়) ঈদুল ফিতর (ঈদের পরের ২য় দিন)।
১৩ সেপ্টেম্বর (২৯ ভাদ্র) ঈদুল আজহা (ঈদের পরের দ্বিতীয় দিন)।
৩০ নভেম্বর (১৬ অগ্রহায়ণ) আখেরি চাহার সোম্বা।
ঐচ্ছিক ছুটি (হিন্দু পর্ব)
৪ ফেব্রুয়ারি (২২ মাঘ) শ্রীশ্রী সরস্বতী পূজা।
২৭ ফেব্রুয়ারি (১৫ ফাল্গুন) শ্রীশ্রী শিবরাত্রী।
১৬ মার্চ (২ চৈত্র) শ্রীশ্রী হরিঠাকুরের আবির্ভাব।
২৩ সেপ্টেম্বর (৮ আশ্বিন) শুভ মহালয়া।
৩ অক্টোবর (১৮ আশ্বিন) শ্রীশ্রী দুর্গাপূজা (মহানবমী)।
৭ অক্টোবর (২২ আশ্বিন) শ্রীশ্রী লক্ষ্মীপূজা।
২৩ অক্টোবর (৮ কার্তিক) শ্রী শ্রী শ্যামাপূজা।
ঐচ্ছিক ছুটি (খ্রিস্টান পর্ব)
১ জানুয়ারি (১৮ পৌষ) ইংরেজি নববর্ষ।
৪ মার্চ (২১ ফাল্গুন) ভষ্ম বুধবার।
১৭ এপ্রিল (৪ বৈশাখ) পুণ্য বৃহস্পতিবার।
১৮ এপ্রিল (৫ বৈশাখ) পুণ্য শুক্রবার।
১৯ এপ্রিল (৬ বৈশাখ) পুণ্য শনিবার।
২০ এপ্রিল (৭ বৈশাখ) স্টার সানডে।
২৪, ২৫ ও ২৬ ডিসেম্বর (১০, ১১ ও ১২ পৌষ) যিশুখ্রিস্টের জন্মোৎসব (বড়দিনের আগের ও পরের দিন)।
ঐচ্ছিক ছুটি (বৌদ্ধ পর্ব)
১৪ ফেব্রুয়ারি (২ ফাল্গুন) মাঘি পূর্ণিমা।
১৩ এপ্রিল (৩০ চৈত্র) চৈত্র সংক্রান্তি।
১১ জুলাই (২৭ আষাঢ়) আষাঢ়ি পূর্ণিমা।
৮ সেপ্টেম্বর (২৪ ভাদ্র) মধু পূর্ণিমা।
৮ অক্টোবর (২৩ আশ্বিন) প্রবারণা পূর্ণিমা আশ্বিনী পূর্ণিমা।
টিকা
যেকোনো সম্প্রদায়ের একজন কর্মচারীকে তার নিজ ধর্ম অনুযায়ী বছরে মোট তিনদিনের মাত্রা পর্যন্ত ঐচ্ছিক ছুটি ভোগ করার অনুমতি দেওয়া যেতে পারে এবং এ ব্যাপারে প্রত্যেক কর্মচারীকে বছরের শুরুতে নিজ ধর্ম অনুযায়ী নির্ধারিত তিনদিনের ঐচ্ছিক ছুটি ভোগ করার ইচ্ছা উপযুক্ত কর্তৃপক্ষ কর্তৃক অনুমোদন করে নিতে হবে। সাধারণ ছুটি, নির্বাহী আদেশে সরকারি ছুটি ও সাপ্তাহিক ছুটির সঙ্গে যোগ করে ঐচ্ছিক ছুটি ভোগ করার অনুমতি দেওয়া যেতে পারে।
Subscribe to:
Posts (Atom)
Popular posts
-
Kingtiger sewage sludge carbonization plant adopts the advanced sludge carbonization technology which can convert sludge to bio coal. T...
-
INTRODUCTION Concrete which forms major component in the construction Industry as it is cheap, easily available and conv...
-
Precast is a smart way to build any type of buildings, safely and affordably. Originally developed in the Nordic countries, modular preca...
-
It has become common knowledge that carbon dioxide is the chief greenhouse gas and the leading cause of global warming. Excessive carbon...
-
ABSTRACT Concrete is weak in tension and strong in compression .Even though reinforcement is provided in tension zone micro...
-
We find use of glass at various points in our day to day life. In construction field, we use it in window panes, mirrors, furniture, e...
-
As the monsoon starts showering we feel relieved from the scorching heat of the summer season. But before arrival of monsoon our home nee...
-
:সুত্র # আয়াতাকার (১নং চিত্র:) ক্ষেত্রফল= দৈর্ঘ X প্রস্থ ক্ষেত্রফল A = lw পরিসিমা = ২ X দৈর্ঘ + ২ X প্রস্থ P = ২ l + ২ w P = পরি...
-
Seismic base isolation is a technique developed to prevent or minimize the damages to the buildings during an earthquake.It works by separa...
-
Quantity of cement mortar is required for rate analysis of brickwork and plaster or estimation of masonry work for a building or structu...